Plastic Surgery

As of April 29 Jan-kees is at the surgeon (Welder), where the original roof is being removed and a walk out deck with cover and seating is being created.
Lars who also welded the gas tank, is taking charge

Today he did the incisions…the big hold up will be finding somebody who can manufacture a correct door.

Covering the electrical equipment
The first cuts around the outside and along the width

Port and Starboard cuts

Ready with cutting……….. attached to the crane and then …….there is the sun in the back

Here is a drawing made by daniel

The back dek moving along

One of the hinges for the hatch. With this kind of hinge the floor will stay even

And it is getting close
Door opening is 80 cm . which allows a door of 67 + the frame on both sides

Closed hatch, smooth surface

Open Hatch, just have to order the Gas Springs, and perhaps later an electric actuator.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s